Our scope of work at Zayed International Airport included Comprehensive rectification works were carried out across multiple phases to address roof leakage issues within Terminal A. The scope included:
Zayed International Airport
Our scope of work at Zayed International Airport included Comprehensive rectification works were carried out across multiple phases to address roof leakage issues within Terminal A. The scope included:
Zayed International Airport
Leakage rectification works were executed across multiple washrooms within the airport facilities. The scope included:
Zayed International Airport
Zayed International Airport
Zayed International Airport
Leakage rectification works were executed across multiple washrooms within the airport facilities. The scope included:
Zayed International Airport
Leakage rectification works were executed across multiple washrooms within the airport facilities. The scope included:
Zayed International Airport
Our scope of work at Zayed International Airport included Comprehensive rectification works were carried out across multiple phases to address roof leakage issues within Terminal A. The scope included:
Abu Dhabi International Airport
This scope involved the inspection and rectification of leakage issues occurring above the GI corrugated sheet sections of the Sky Park roof. The work included identifying leakage points, applying appropriate sealing materials, and reinforcing affected sheet joints to restore waterproofing integrity and ensure long‑term protection against water ingress.
Abu Dhabi International Airport
This project focused on repairing leakage issues on the rooftop slab above the Sky Park car park area. The scope included thorough surface preparation, sealing of visible cracks, and the application of a protective coating system designed to prevent future water penetration and enhance the durability of the slab.
Abu Dhabi International Airport
Installation of a complete membrane waterproofing system, including substrate preparation, membrane fixing, detailing around penetrations, and application of a final protective layer to ensure long‑lasting roof performance.
Abu Dhabi International Airport
Application of the Sikalastic waterproofing system on deteriorated roof areas. Works included cleaning, priming, repairing damaged sections, and applying the Sikalastic coating to restore waterproofing integrity
Abu Dhabi International Airport
Supply and application of PU foam across the roof surface, including foam spraying, leveling, and application of a protective topcoat to enhance insulation and waterproofing performance