Completed Project

Zayed International Airport

Demolition Scope of Jumbo Glasses

  • Executed controlled demolition and safe removal of large format glass panels.
  • Ensured full compliance with airport safety protocols and operational restrictions.
  • Delivered debris management and site clearance with minimal disruption to airport activities.

Zayed International Airport

Demolition Scope of Jumbo Screen Glasses

  • Carried out dismantling and removal of oversized screen glass assemblies.
  • Utilized specialized tools and trained personnel to ensure precision and safety.
  • Coordinated closely with airport authorities to maintain secure work zones.

Zayed International Airport

Demolition of Planter and Screen Glasses at Pier C Area

  • Removed planter structures and associated screen glass units at Pier C.
  • Performed structural disassembly while protecting adjacent facilities and utilities.
  • Completed restoration of the work area for subsequent construction activities.

Zayed International Airport

Totem Removal

  • Dismantled and removed existing totem structures within the airport premises.
  • Managed lifting operations, equipment mobilization, and safe disposal.
  • Ensured seamless execution without impacting passenger flow.

Zayed International Airport

Logistic Support

  • Provided comprehensive logistics support including manpower, equipment, and material handling.
  • Supported internal airport operations and contractor activities across multiple zones.
  • Delivered specialized assistance for shifting baggage from the Baggage Handling Area.

Zayed International Airport

Logistic Support for Shifting of Bags from Baggage Handling Area

  • Provided comprehensive logistics support including manpower, equipment, and material handling.
  • Supported internal airport operations and contractor activities across multiple zones.
  • Delivered specialized assistance for shifting baggage from the Baggage Handling Area.

Zayed International Airport

Installation of Feed Screen at CP Area

  • Installed new feed screen systems with precision alignment and secure mounting.
  • Conducted testing and commissioning to ensure operational readiness.
  • Coordinated installation activities within active airport environments.

Zayed International Airport

Logistic Support for the Charging Table

  • Supplied logistics manpower and equipment for installation of charging table units.
  • Facilitated material movement, positioning, and on site coordination.
  • Ensured timely support to meet project installation schedules.

Zayed International Airport

Logistic Support for Smoke Cabin

  • Delivered logistics and handling services for smoke cabin installation.
  • Assisted in equipment positioning, assembly support, and site coordination.
  • Maintained strict adherence to safety and airport operational guidelines.

Zayed International Airport

Roof Leakage Rectification – Phase 1

Our scope of work at Zayed International Airport included Comprehensive rectification works were carried out across multiple phases to address roof leakage issues within Terminal A. The scope included:

  • Resurfacing of gutter systems and critical roof areas
  • Application of high‑performance EPDM membranes
  • Installation of Sika waterproofing systems
  • Sealing of joints and penetrations using premium silicone sealants
  • Execution of all works in compliance with stringent aviation safety and operational standards

Zayed International Airport

Roof Leakage Rectification – Phase 2

Our scope of work at Zayed International Airport included Comprehensive rectification works were carried out across multiple phases to address roof leakage issues within Terminal A. The scope included:

  • Resurfacing of gutter systems and critical roof areas
  • Application of high‑performance EPDM membranes
  • Installation of Sika waterproofing systems
  • Sealing of joints and penetrations using premium silicone sealants
  • Execution of all works in compliance with stringent aviation safety and operational standards

Zayed International Airport

Wet Room Area Leakage Rectification – Phase 1

Leakage rectification works were executed across multiple washrooms within the airport facilities. The scope included:

  • Identification and sealing of leakage points
  • Application of high‑grade silicone sealants on critical joints, fixtures, and interfaces
  • Ensuring durable, long‑lasting protection against moisture ingress
  • Full compliance with airport safety, hygiene, and quality standards

Zayed International Airport

Feed Screen Glasses Removing and Reinstallation

  • Removed existing feed screen glass panels and reinstalled upgraded units.
  • Ensured precision handling to prevent damage during removal and re fixing.
  • Completed work within tight operational windows to avoid service disruption.

Zayed International Airport

Equipment Supply

  • Supplied specialized equipment as per project specifications.
  • Ensured timely delivery, quality assurance, and compliance with airport requirements.
  • Supported installation teams with technical coordination where required.

Zayed International Airport

Wet Room Area Leakage Rectification – Phase 2

Leakage rectification works were executed across multiple washrooms within the airport facilities. The scope included:

  • Identification and sealing of leakage points
  • Application of high‑grade silicone sealants on critical joints, fixtures, and interfaces
  • Ensuring durable, long‑lasting protection against moisture ingress
  • Full compliance with airport safety, hygiene, and quality standards

Zayed International Airport

Wet Room Area Leakage Rectification – Pier C

Leakage rectification works were executed across multiple washrooms within the airport facilities. The scope included:

  • Identification and sealing of leakage points
  • Application of high‑grade silicone sealants on critical joints, fixtures, and interfaces
  • Ensuring durable, long‑lasting protection against moisture ingress
  • Full compliance with airport safety, hygiene, and quality standards

Zayed International Airport

Roof Leakage Rectification – Phase 3

Our scope of work at Zayed International Airport included Comprehensive rectification works were carried out across multiple phases to address roof leakage issues within Terminal A. The scope included:

  • Resurfacing of gutter systems and critical roof areas
  • Application of high‑performance EPDM membranes
  • Installation of Sika waterproofing systems
  • Sealing of joints and penetrations using premium silicone sealants
  • Execution of all works in compliance with stringent aviation safety and operational standards

Abu Dhabi International Airport

Sky Park Roof – Roof Leakage Rectification

This scope involved the inspection and rectification of leakage issues occurring above the GI corrugated sheet sections of the Sky Park roof. The work included identifying leakage points, applying appropriate sealing materials, and reinforcing affected sheet joints to restore waterproofing integrity and ensure long‑term protection against water ingress.

 

Abu Dhabi International Airport

Sky Park – Car Park Leakage Rectification

This project focused on repairing leakage issues on the rooftop slab above the Sky Park car park area. The scope included thorough surface preparation, sealing of visible cracks, and the application of a protective coating system designed to prevent future water penetration and enhance the durability of the slab.

Abu Dhabi International Airport

Diwan Building – Roof Leakage Rectification

Installation of a complete membrane waterproofing system, including substrate preparation, membrane fixing, detailing around penetrations, and application of a final protective layer to ensure long‑lasting roof performance.

 

Abu Dhabi International Airport

Logistic Park – Roof Leakage Rectification

Application of the Sikalastic waterproofing system on deteriorated roof areas. Works included cleaning, priming, repairing damaged sections, and applying the Sikalastic coating to restore waterproofing integrity

Abu Dhabi International Airport

Etihad Cargo Building – Roof Leakage Rectification

Supply and application of PU foam across the roof surface, including foam spraying, leveling, and application of a protective topcoat to enhance insulation and waterproofing performance

 

Ongoing Project

Zayed International Airport - Various Building Projects

img img

General Construction

There are many variations of a passages of Lorem Ipsum available

Read More
img img

Architecture & Building

There are many variations of a passages of Lorem Ipsum available

Read More
img img

Interior Design

There are many variations of a passages of Lorem Ipsum available

Read More
img img

Combine Electricity

There are many variations of a passages of Lorem Ipsum available

Read More
img img

Bridge Tringle Core

There are many variations of a passages of Lorem Ipsum available

Read More
img img

Contemporary Villa

There are many variations of a passages of Lorem Ipsum available

Read More